The Incredible Home Heating System Project – Is Time to Challenge Your Skill!

Although now still a summer time, but is also the best time to equip yourself with the incredible home heating system, where it might take up to 2-3 months of time construction (When you’re finished it, you can use it for keeps your house comfort during the cold winter).

Since this is a huge project, you need to ensure all the require components are fully standby:

Heater

It is better to use a heater that has 8kW heating power. You have to connect it to the system, by simply using flexible shielded pipes. By this way, you can easily move the heater around its place without even disconnecting it from the main system!

Radiator

You need to have two radiators, where both of its will be connected to the system using the standard ½” pipes.

Operation Panel

It is a user interface part of the controller.

Expansion Volume

It is an open metal tank that be used to compensate the water expansion whilst the temperature increasing. The normal level/volume for this system is about 1/10 of all water volume. You need to connect it to the system using the standard 1/2″ pipes as well.

Note: This project is a highly dangerous task, as there is a voltage inside that has AC 220V! Therefore, never try to acting smart, if you not an experienced electrician, as this can be a lethal weapon and might bring casualty, if you insists to mess with it!